WASHWOOD HEATH DEPOT
Bounded by Bromford Lane, Drews Lane, Warren Road and Aston Church Road
Washwood Heath, Birmingham
View the site map HERE.
![](https://www.freetimepays.com/uploadedfiles/HS2%20Washwood%20Heath%201.jpg)
PROJECT TEAM:
Client: HS2 Ltd
Architects: HS2's EDP, Howells
Contractor: Selected in Autumn 2023
Agent: Jacobs
Planning Application Number: 2022/08485/PA
![](https://www.freetimepays.com/uploadedfiles/HS2%20Washwood%20Heath%202.jpg)
HS2: WASHWOOD HEATH DEPOT
The 30-acre site will be transformed into the nerve centre of the new High Speed railway line, creating 550 jobs in the process.
Three buildings will be built: a Maintenance Building depot, a Network Integrated Control Centre [NICC], and a cleaners’ and drivers’ [C&D] building – each incorporating solar panels, sustainable drainage, renewable energy & low carbon materials.
All three buildings have been designed to allow maximum accessibility for pedestrians and cyclists, with dedicated routes connecting with Birmingham’s future transport network. A contractor will be announced in autumn 2023.
Maintenance Building depot:
![](https://www.freetimepays.com/uploadedfiles/HS2%20Washwood%20Heath%201.jpg)
![](https://www.freetimepays.com/uploadedfiles/HS2%20Washwood%20Heath%203.jpg)
![](https://www.freetimepays.com/uploadedfiles/WWH.jpg)
Network Integrated Control Centre [NICC]:
![](https://www.freetimepays.com/uploadedfiles/NICC2.jpg)
![](https://www.freetimepays.com/uploadedfiles/NICC1.jpg)
![](../UploadedFiles/9913da3067e4450eac254e5ea073a26c.png)
C&D Building:
![](https://www.freetimepays.com/uploadedfiles/CD2.jpg)
![](https://www.freetimepays.com/uploadedfiles/CD.jpg)
Washwood Heath Depot, images from HS2 Ltd.
WATCH THIS SPACE FOR MORE UPDATES!